LOTO Enclosure Box & Training Guides

Brochure

Give your team a practical, repeatable way to build safe isolation, lock-out/tag-out, and verification habits. Technotraining’s LOTO Training Box enables realistic training using multiple isolators, guided risk assessment, and structured instructor-led exercises.

Connect up to 8 stations to each box

4 isolators control 2 stations each

A range of simulated LOTO tasks develop a safety culture mindset

Skills and competency verification

Panel schematic included

Instructor guides to maximise learning

This practical and realistic rig allows you to train with real isolation scenarios and real consequences, but without the risk. You can run consistent training sessions for any size team, time and again. With our structured exercises and training guides, you’ll achieve better comprehension and retention. Your team will develop their confidence and acquire the habits and knowledge to prevent energy-related incidents.

Power inlet cable for wall socket (2 m)
2 x IEC power outlet cables to two-way extension leads
4 x locks and tags
An MCB locking device
A 3-pin plug locking device
Panel schematic for risk assessment
Instructor guide to maximise learning yield

Typical LOTO kit training applications

CHANGE A PART AT THE CONNECTED STATION

Learners plan the task, assess risks, isolate energy, verify dead, and safely replace a component in the enclosure.

CHANGE AN ISOLATOR
ON THE ENCLOSURE DOOR

Learners select the correct isolation and verification points and carry out the replacement safely.

CHANGE A MCB

Learners identify the correct miniature circuit breaker (MCB), isolate, test for dead, and remove and replace the device using correct procedures.

CHANGE AN INCOMING
ISOLATOR

Isolators cannot isolate their own infeed. Challenge learners to select a safe isolation point.

PRACTISE MULTIMETER SKILLS

Use the panel schematic to verify de-energisation, prove the meter before and after testing, and identify live conductors safely. This builds confidence and competence in essential electrical test and verification procedures.

Build safer isolation habits in-house

Learners get used to working inside industrial panels. Learners can trace energy through the isolator, MCBs, terminal blocks, and IEC outputs before deciding where to lock off and where to verify dead.

Key LOTO learning decisions:

Where should I isolate? Select the isolation point that matches the task.
Who is affected? Identify shared stations and workers involved.
Where do I verify dead? Choose safe meter points, then prove the meter before and after.
What could remain live? Use the schematic and panel view to identify live conductors and stored energy.

€2,700 (+ VAT)

Contact us

Scroll to Top